The Question You're Being Asked
Boards, audit committees, and regulators are asking some version of the same question in 2026: are we ready for post-quantum cryptography? The question sounds binary. The honest answer is never binary — "ready" is a position on a curve, and the curve has specific waypoints.
The three existing TigerTrust posts cover the pieces of that curve. Post-Quantum Cryptography in 2026: Where Browsers, CAs, and Enterprises Actually Stand sets the ecosystem baseline. CNSA 2.0 and the 2027 Compliance Clock grounds the regulatory calendar. Cryptographic Bill of Materials (CBOM) is the inventory substrate. What's missing is the one-page answer to "are we ready?" — the checklist leadership can take to the board.
This post is that checklist. Twelve points across four phases. Each has a specific artefact that proves the item is done, so this is also a readiness audit scorecard, not just a planning document.
The Four Readiness Dimensions
Before the twelve points, the frame. PQC readiness has four dimensions, and strength in one does not substitute for weakness in another.
Inventory
Do you know what cryptography you're running? Every algorithm, every library, every certificate, every key, every protocol — with the relationships between them. Without the inventory, every other dimension is a guess.
Policy
Do your written policies reflect the post-quantum trajectory? Issuance policies, procurement policies, cryptographic-standards policies, vendor assessment policies — all of them need explicit language about PQC algorithms, deprecation timelines, and migration commitments.
Deployment
Are PQC algorithms actually running somewhere in production? Not pilot, not proof-of-concept — in the actual handshake, in the actual signature verification, in the actual key exchange. Readiness without deployment is theory.
Governance
Can you prove the first three dimensions to an auditor? Evidence packs, signed audit trails, framework-mapped controls, continuous drift detection. Without governance, the inventory is a spreadsheet, the policies are PDFs, and the deployment is a pilot that nobody is tracking.
The 12-Point Checklist
Phase 1 — Inventory (Items 1–3)
Item 1: A continuously regenerated CBOM
Produce a Cryptographic Bill of Materials covering every entity class: algorithms, protocols, certificates, keys, libraries, applications. CycloneDX 1.6 format. Refresh cadence: hourly at most, daily minimum.
Evidence: Current workspace CBOM export, dated within the last 24 hours. The CBOM has to be continuously regenerated — a snapshot from six months ago is not evidence of readiness, it's evidence of a snapshot.
See the CBOM post for the schema and the complete build steps.
Item 2: Code-security coverage of pre-production state
The CBOM from inventory point 1 shows what's running. Item 2 is: do you also see what's about to run? That requires static analysis of source repositories, build manifests, Dockerfiles, and container image layers.
Evidence: TigerGate (or equivalent) integration against every production-bound code repository, with CBOM diffs posting as PR review comments. A workspace that scans post-deployment only catches problems after they ship; a workspace that scans at PR time stops them at the gate.
Item 3: Algorithm classification against NIST and CNSA 2.0 approval lists
Every algorithm in the CBOM must carry an explicit classification: NIST PQC-approved (ML-KEM, ML-DSA, SLH-DSA, FALCON), NIST approved but pre-quantum (RSA-3072+, ECDSA on P-256/P-384/P-521, Ed25519, AES-128/192/256, SHA-256+), deprecated (RSA-1024, SHA-1, 3DES), or CNSA 2.0 non-compliant (which tightens the "NIST approved but pre-quantum" set further).
Evidence: A classification report showing the breakdown across the workspace, with trend lines over time. The quantum security level field in CycloneDX 1.6 (nistQuantumSecurityLevel) is the canonical field for this; your tooling has to populate it.
Phase 2 — Policy (Items 4–6)
Item 4: An approved cryptographic standards policy with PQC trajectory
Written, board-approved, versioned. The policy specifies: which algorithms are permitted for which purposes (signing, encryption, key exchange, hashing, MAC), which are deprecated with phase-out dates, which PQC algorithms are permitted in hybrid and when they become mandatory.
Evidence: The policy document, signed by the CISO with an approval date within the last 12 months. Policies older than 12 months are stale — the PQC ecosystem is moving fast enough that annual refresh is the minimum discipline.
Item 5: A procurement policy that gates on PQC readiness of vendors
Every new vendor contract — software, hardware, SaaS, managed service — must include specific language on the vendor's PQC roadmap. Vendors cannot credibly promise 2030 compliance without a specific timeline; absence of a timeline is the signal.
Evidence: A redacted procurement questionnaire that includes PQC-specific questions, plus a sample of three recent vendor assessments completed using it.
Item 6: A deprecation calendar tied to the CA/B Forum and CNSA 2.0 milestones
Your organisation's internal deprecation calendar should mirror the external calendar: RSA-2048 no longer permitted for new signatures by 2030 (per CNSA 2.0 and NIST SP 800-131A). SHA-1 removed from any remaining internal use. TLS 1.2 phased out in favour of 1.3. Email S/MIME certificates moved to PQC-ready profiles.
Evidence: A calendar document mapping specific internal workstreams to each external milestone, with owners named for each item.
Phase 3 — Deployment (Items 7–9)
Item 7: Hybrid classical + PQC key exchange in production TLS
At least one production TLS endpoint negotiating hybrid key exchange (X25519MLKEM768 codepoint is the common choice) with real client traffic. Browser and server support rolling out through 2026; Chrome, Firefox, Edge, and OpenSSL 3.4+ all ship hybrid support.
Evidence: A packet capture or TLS handshake log from a production endpoint showing X25519MLKEM768 (or equivalent) negotiated. One endpoint suffices for item 7; expanding to the full estate is a later phase.
Item 8: PQC-signed certificate issuance in a pilot workspace
A pilot workspace issuing certificates signed with ML-DSA (or equivalent NIST PQC signature algorithm) through a configured CA. CAs are prototyping this through 2026 and 2027; mainstream public-trust support lands in 2029.
Evidence: A sample certificate with an ML-DSA signature algorithm field, from the pilot workspace. Internal use first, public-trust later — but internal-use pilots demonstrate that the stack works end to end.
Item 9: Crypto-agile issuance pipeline
Your certificate issuance pipeline must be able to switch between RSA, ECDSA, Ed25519, and ML-DSA signing without application code changes. That means: issuance policy configuration drives algorithm choice, applications accept certificates on any supported curve/algorithm, and the deployment pipeline carries the chosen artefact without opinion.
Evidence: A documented issuance-policy change that switched algorithm from (say) ECDSA P-256 to ML-DSA in a pilot workspace, with the before/after certificate pair, and confirmation from the consuming application that validation succeeded.
Phase 4 — Governance (Items 10–12)
Item 10: Signed audit stream to a SIEM
Every cryptographic operation that matters — certificate issuance, key creation, signing operation on an HSM, algorithm policy change, CBOM export — emits a signed audit line to the organisation's SIEM. Signed, not just logged. Tamper-evident audit is the evidence standard regulators expect.
Evidence: A sample of audit events from the last 7 days, covering issuance, revocation, and policy-change events, with cryptographic verification demonstrating they haven't been modified since emission.
Item 11: Framework-mapped evidence packs
CBOM exports and audit evidence pre-annotated against the specific controls each export satisfies — PCI DSS 4.0, SOC 2 Type II, HIPAA, IEC 62443, FIPS 140-3, CNSA 2.0, DORA, NIS2, SEC cybersecurity disclosure. The auditor should not need to cross-reference manually.
Evidence: A sample evidence pack from the last audit cycle, with the mapping table attached.
Item 12: PQC readiness scoring with trend lines
A single dashboard showing: percentage of workspace on PQC-ready primitives, percentage on pre-quantum but NIST-approved, percentage on deprecated. Updated continuously. Trend lines over 6–12 months.
Evidence: A current screenshot of the scoring dashboard, plus a snapshot from 6 months ago, showing the direction of travel. Movement matters more than any single data point.
Scoring Your Readiness
Each item scores on three levels:
- 0 — not in place
- 1 — partial (some workspaces, some products, some vendors, not all)
- 2 — complete (continuous, estate-wide, auditor-ready)
Maximum: 24 points.
| Score range | Readiness position |
|---|---|
| 20–24 | Ready. You can answer "yes" to the board question with evidence to back it up. |
| 14–19 | Positioned. You're on trajectory; specific weak items need focused work. |
| 8–13 | Aware. You've started but the critical infrastructure (Phase 1 inventory especially) isn't in place yet. |
| 0–7 | At risk. The 2030 CNSA 2.0 deadline is 3 years away. Starting now is still possible; waiting another 12 months is the breakpoint. |
The Timeline
For organisations currently scoring 8–13 (the most common place to be in late 2026):
| Milestone | Target quarter |
|---|---|
| Items 1–3 (Inventory) complete | Q2 2027 |
| Items 4–6 (Policy) complete | Q3 2027 |
| Items 7–9 (Deployment) piloted | Q4 2027 |
| Items 10–12 (Governance) complete | Q1 2028 |
| Full-estate PQC hybrid rollout | Q4 2028 |
| PQC-signed issuance on internal certs | Q2 2029 |
| CNSA 2.0 and 2030 deadlines | Q1 2030 |
That gives a 12-month buffer before the regulatory deadlines. The buffer is not optional — migration always finds edge cases that burn the buffer.
For organisations scoring 0–7: the same timeline with the first six months compressed into getting Items 1–3 running. Inventory is the gate that unlocks every other item.
How TigerTrust and TigerGate Score You Against This Checklist
Several items on the checklist are built-in capabilities of the TigerTrust and TigerGate platforms:
- Item 1 (continuously regenerated CBOM) — every TigerTrust workspace carries a live runtime CBOM; every TigerGate-connected repository carries a code-security CBOM. Both are CycloneDX 1.6 exports, continuously regenerated.
- Item 2 (code-security coverage) — TigerGate ships this directly: AST-level static analysis of every production-bound repository, PR diffs that annotate CBOM changes at review time.
- Item 3 (NIST / CNSA classification) — automatic on every algorithm the TigerTrust and TigerGate inventory surfaces.
- Item 9 (crypto-agile issuance) — the TigerTrust PKI-as-a-Service issuance policy switches between RSA, ECDSA, Ed25519, and (when the CA supports it) ML-DSA without application code changes.
- Item 10 (signed audit stream) — every TigerTrust operation emits a signed audit line to the configured SIEM.
- Item 11 (framework-mapped evidence packs) — pre-annotated CycloneDX exports with control mapping across PCI DSS 4.0, SOC 2, HIPAA, IEC 62443, FIPS 140-3, CNSA 2.0, DORA, NIS2, SEC.
- Item 12 (PQC readiness scoring) — the workspace dashboard shows PQC readiness with trend lines, drift alerts, and per-application scoring.
Items 4–8 are organisational commitments the platform can't make on your behalf — policy approval, procurement updates, deployment pilots. The platform reduces the operational cost of each; the commitment still has to be yours.
Taking This to the Board
The checklist, scored, is the one-page answer to the board question. The honest conversation most CISOs need to have in late 2026 is:
- Current score (be honest — in most estates it's 6-12)
- Gap analysis (which specific items are at 0 or 1)
- Investment required (people + platform)
- Timeline to 20+ (should be 18 months; longer is a risk)
Boards can make procurement and headcount decisions off a scorecard. They cannot make decisions off "we're working on PQC readiness." The checklist exists to convert the second into the first.
Related Reading
- Cryptographic Bill of Materials (CBOM): How to Inventory Your Crypto Before Post-Quantum Migration
- CNSA 2.0 and the 2027 Compliance Clock: Start Your PQC Migration Now
- Post-Quantum Cryptography in 2026: Where Browsers, CAs, and Enterprises Actually Stand
- 100-Day TLS Certificates: Your 15 March 2027 Readiness Checklist
- TigerGate — code-security CBOM product